Oxygen Sensor - Long Lead

When using the SCP/Kooks headers the collectors where the oxygen sensors are located is moved substantially rearward. You will have to use either our new long lead oxygen sensors or some O2 sensor extensions.

$63.86

SCP will attempt to meet or beat any other sources pricing on an identical item. Call us to discuss 513-697-6501.

NOTE:  FREE SHIPPING will apply to this item on orders that total more than $99.   If this item is purchased individually shipping within the lower 48 is extra and cost is based upon package size, weight, and distance from SCP.  

 

When using the SCP/Kooks headers the collectors where the oxygen sensors are located is moved substantially rearward. You will have to use either our new long lead oxygen sensors or some O2 sensor extensions.

 

To help you choose which will work best for you, consider these thoughts. If you have more than 60K miles on your existing O2s, then buy our new O2 sensors because these sensors do degrade with mileage. If you have had engine coolant pass over your O2 sensors, then buy our new O2 sensors. If neither of these situations apply to you then go with our O2 extensions.

 

Available in either the 3-wire or 4-wire to suite your car. Just let us know what year car you have and that will tell us which you need.

 

BUY TWO sensors for all V-engine configurations.

 

Customers who bought this item also bought

SCP 3-bolt Flange Header Adapters with Seal-4-Good Reusable Gaskets

To be used with the Kooks 3/4 length SOHC/DOHC headers, or the V6 Long Tube headers. These should be used as the first part of the remainder of your exhaust after the headers. These conveniently mate to the flat 3-bolt header collector and you can continue your exhaust rearward from these adapter.

$69.84

4.6L DOHC Header Installation Kit with Seal-4-Good Reusable Flange Gaskets

Includes a "How to install your headers" sheet that shares all the tips and tricks of how to install the 4.6L headers. New SEAL-4-GOOD reusable header gaskets and custom header bolts are also included.

$69.84

3.8L V6 Header Installation Kit

Includes a "How to install your headers" article from the June 2000 SCCoA Club Newsletter, Chargin’ Thunder. It shares all the tips and tricks of how to install SC headers. New FelPro header gaskets and custom header bolts are also included.

$53.93